Credit: Stefan Boss
Florian Schäfli (left) and Adrian Wicki (right) install soil moisture sensors to help verify electrical resistivity tomography (ERT) measurements. This requires digging a trench which filled in again after the installation of the sensors. ERT uses a series of electrodes in the soil to measure the electrical resistance of the ground.