Credit: Photo courtesy of Vamegh Rasouli.
At $40 million, the drilling and completion lab at UND’s Petroleum Engineering department will soon be the sole facility of its size and scope in the world. Vamegh Rasouli, professor of petroleum engineering, stands here next to the lab’s 32-foot tower, which is lying on its side.